We have a fleet of 13 trains to transport coal. Each train has three locomotives and 150 cars, with a capacity of 50 metric tons per car.

Project

Drummond trains

Coal transported:
29.2 million metric tons per year


Course Distance:
192 kilometers between our mining projects and Puerto Drummond


Direct Load Beginning:
March 31, 2014


Duration of the course:
Approximately 5 hours of travel time and each train is unloaded in approximately 1.45 hours on the double and quadruple turners.

We have a fleet of 13 trains to transport coal. Each train has three locomotives and 150 cars, with a capacity of 50 tons per car.

To transport coal from our mining operations to Puerto Drummond, we use three railcar loading facilities adjacent to our mines. Each loading facility has 6,000 tons per hour capacity.

Upon arrival at Puerto Drummond, the wagons are unloaded by three dumpers.

The railroad line we use is concessioned to Fenoco, with routes that have been extended to a double line on more than 80% of the route. Construction of this second parallel line is ongoing and is expected to be completed within the next 3 years.

Currently, at Puerto Drummond we can store up to 1.5 million tons of coal.. This coal is stored according to its quality properties, which allows us to prepare blends that meet the quality requirements of each of our customers at the moment of shipment.

Locomotives
44

Wagons
1,992

Each wagon can contain
50 metric tons.

Capacity
7,500

The train layout is 3 locomotives and 150 cars each.